| |
Gas and Chemical Industries
Select a client:
Mosaic
Year: 2005
Client: Mosaic Oil NL
Industry: Production of Crude Oil and Gas
Job Description:
Design of Pipework and Acoustic Shelter for the relocation of reciprocating compressor to Churchie Gas Plant. Scope included detailed design of pipework and pipe supports, update of P&IDs, earthworks design, and the structural design of compressor enclosure.
Design of Production Separator for the Churchie Plant. Scope included the design and detailing of the vessel, skid and associated pressure piping.
Drafting of P&IDs and Hazardous Area Plot Plans for Silver Springs Facility.
Design and Drafting of Piping installation for Condensate Storage at the Churchie Gas Facility
Year: 2003
Client: Mosaic Oil NL
Industry: Production of Crude Oil and Gas
Job Description:
Churchie Gas Field - Site layout of Plant, civil and piping design for stage 1 and stage 2 of the gas separation and dehydration plant. Alignment Sheet for pipeline. Assistance to Mosaic Oil with Project Engineering.
Back to Top
BOC Limited
Year: 2002 - 2005
Client: BOC Limited
Industry: Production of Processes Gases
Job Description:
2005:
Bulwer Island - Design and Project Management piping and vessel modifications within the Bulwer Island Facility
2004:
- Project Engineering and design of piping modifications to CO2 Tank at Bulwer Island to permit separation of product batches.
- Assessment of foundation settlement on Liquid Oxygen and Liquid Nitrogen Tanks across BOC's Australian sites. Assessment was in accordance with API653.
- Provide a report nominating the changes in API650 and API620 between the 1965 Edition and 2004 Edition.
2003 - 2005:
Develop Pressure Equipment Inspection Philosophies in accordance with AS3788 for Pressure Vessels and Piping at Bulwer Island, Townsville and Mount Gordon Sites.
2003:
Develop Inspection Philosophy to AS3788 for pressure pipework at the Cryocentre in Victoria.
2002:
Project Engineering and piping and vessel design of modification to the Argon Compressor at Bulwer Island.
Back to Top
Origin
Year: 2000 - 2005
Client: Origin Energy
Industry: Natural Gas Production
Job Description:
2005:
Field Compressor Installation Earthworks design - Myall Creek and Newstead.
2004:
Pipe stress analysis for Spring Gully Plant. Miscellaneous projects.
2003:
Kincora Gas Plant - Design, draft (Autoplant 3-D), project manage above ground process piping to replace under-ground piping.
Miscellaneous projects involving pressure vessel certifications, setting up piping specifications, drafting.
2001 - 2002:
Project Engineering for the installation of Acoustic Enclosures around the Peat Gas Facility's Sales Gas Compressors.
Project Engineering for the design, procurement, installation and commissioning of surface facilities for a 4 well Coal Seam Methane appraisal development.
Project Engineering for the design and procurement of surface facilities for a 5 well Coal Seam Methane expansion.
2000 - 2001:
Design and drafting of Dawson River 3km pipeline, pig launcher, receiver, metering station, assist with procurement.
2000 - 2001:
Design and drafting of Myall Creek 17km pipeline, pig launcher, receiver, metering skid.
Design and drafting of Glentulloch Creek 29km pipeline. Review design documentation and AS2885.1 risk assessment.
Provide Engineering support both off site and in Origin Energy's Offices.
Back to Top
Aus. Paper
Year: 1997 - 2005
Client: Australian Paper - Maryvale Mill
Industry: Pulp Production
Job Description:
2004, 2005:
Various piping stress analyses
2003:
Remaining life assessment of Chlorine Storage Vessels. Fatigue and FEA calculations.
2002:
Pipe stress analyses, AS3788 Pressure Vessels remaining life assessmen
1999:
Pipe stressing analyses for new Digester piping and other miscellaneous projects
Prepare Tanks Auditor's check list.
2001:
AS1210 design and drafting of vessels for the CSTR Project
2000 - 2001:
Various piping stress analyses
1996 - 1997:
Detailed design and drafting of a Duplex Stainless Steel Digester Pressure Vessel.
Pipe stressing analyses associated with Digester 6B Project.
Back to Top
Santos
Year: 1998 - 2005
Client: Santos
Industry: Production of Crude Oil and Gas
Job Description:
2005:
Design, and drafting of suction bottles for Mereenie CTP Compressors.
2005:
Design verification for design registration of pressure vessels at Mereenie Central Treatment Plant and Eastern Satellite Station in Central N.T.
2003:
-Field checking and drafting of P&ID's for Wallumbilla LPG Plant, Moonie Oil Facility.
-Provision of scope for the Certification of pressure vessels - Mereenie Plant.
-Verification of Ballera Flare Drum re-rate. This included AS1210 low temperature re-rate calculations.
-Provide Drafter and Clerical Officer on a weekly basis in the Brisbane Drawing Office.
2002:
-Field checking of piping for the Jackson Fields and drafting of electronic P&ID's, line lists, instrument lists, equipment lists, loop drawings.
-API 653 evaluation and drafting modifications for a 44m diameter floating roof tank at Lytton Terminal
2001:
Risk assessment of screwed fittings at various sites
1999 - 2001:
Provide Drafting personnel and Document Controller to assist in the Drawing Office
1998:
Design and drafting of piping modifications, foundations for a $0.5m Compressor upgrade Project at Silver Springs. Provide Project Engineering services. Devise Safety Plans, Tie-in procedures. Provide Engineering Supervision on site.
1997 - 1998:
Field check and draft P&ID's at Lytton Terminal, Jackson, Watson, and numerous other Satellite sites.
Back to Top
Incitec
Year: 1996 - 2005
Client: Incitec Pivot - Pinkenba Plant, Brisbane
Industry: Fertiliser Manufacture
Job Description:
2005:
-Ammonia Storage Upgrade preliminary design and cost estimate - Gibson Island.
-Pressure Vessel re-rating calculations for Korragang Island Acid Plant - Newcastle.
-UAN Facility preliminary design and cost estimate - Pinkenba Plant.
2004:
Bagging and truck loading design - Pinkenba Plant
2003:
Provide project estimates. Evaluation of loads on compressors, devise modifications.
2002:
Design and draft a 7.0m diameter stainless steel Alum Tank
2001:
Certification of Reactor Reaction Vessel Upgrade
2000:
Design and draft Reactor Vessel
1999:
Evaluation of Acid Tank no.5 in accordance with API653
1996 - 1997:
Piping stress analyses and Tank evaluations in accordance with API650.
1996:
-Design and detailed mechanical drafting of Rotopacker machine.
-Design and drafting of access-way modifications.
1996:
Capital cost estimate for a Topan Alum Storage Upgrade. Detailed design, drafting, preparation of specifications for a Topan Alum Storage Upgrade
1995 - 1996:
-Design and drafting of Feed Hopper, structural steelwork, modifications to Mixer Drum.
-Evaluations in accordance with AS1228 and AS1210 of steam generating plant, heat exchangers, absorber pressure vessel.
Back to Top
|
|