Oil Refining, Bitumen and Petroleum
Select a Client:
Caltex
Year: 1994 - 2005
Client: Caltex Refinery, Lytton, Brisbane
Industry: Crude Oil Refinery
Job Description:
2004 - 2005 Quench Pumps Replacement Project ($6.5M Capital):
Detailed design and drafting of piping, pump foundations, structural steel and foundations, accessways over the pumps. All piping and structural drafting performed in 3-D.
2003:
- Piping drafting (Autoplant 3-D) for Terminal piping mofifications
- Pipe stress analyses, drafting (Autoplant 3-D) Quench Oil Pumps Replacement Project. Assist with project engineering.
- Vessels, Heat Exchangers AS1210 re-rate calculations.
- FCCU C.O. Line bellows replacement stress analysis.
- Pipe stress analyses.
2002
Piping stress analyses, detailed design of Rotor Coffins for storage of shafts, design and drafting of platform modifications.
2001
Project Engineering, stress analysis and drafting for the Reactor Overhead Line and Quench Oil Pumps Piping
2001
Flare Header Upgrade Project. Detailed stress analysis of the Flare System for low temperature relief. This involved pipe stress analysis utilising "Autopipe" and finite element analysis utilising "MSC Nastram for Windows" software. Drafting of major modifications to the Flare Header. Provide Project Engineering assistance.
2001
Drafting various projects for the 2001 T.A.R.
1998
Design and Drafting of various Projects for the 1998 F.C.C.U. and Alkylation Unit Shut-Downs.
1997 - 1998
Detailed pipe stress and finite element analysis of the F.C.C.U. C.O. Line and top head of the Regenerator.
1994 - 1998
Perform pipe stressing and pressure vessels calculations for Ampol Project and Inspection Departments.
1997 - 1998
Design and shop detailing of a 35 metre high stair structure and support table for heat-exchangers as part of the Alkylation Unit Acid Settler Project.
1997
Design and drafting of waste-water effluent system at Lytton Terminal.
1996
Design and drafting for a Boiler feed-water upgrade project.
1996
Design and drafting of modifications to an Acid Re-run Column.
1995
Design of internal modifications to the FCCU Reactor Riser.
1995
Detailed design and drafting of internals for a Hydro-treater pressure vessel for Ampol Refinery.
1994
Design and drafting of new nozzles and platforms for four towers and two drums. Vessel re-rate calculations.
Back to Top
BP Refinery
Year: 1993 - 2005
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
2003, 2005 Turnarounds Projects.
2003:
Design and drafting of Lube Oil and Seal Oil skids and tanks, piping stress analysis and support design for FCCU compressor turbine steam piping, FEA analysis and design of FCCU bypass ductwork expansion elbows.
Pipe Stress Analysis and API 610 pump compliance calculations for new pumps in the Alkylation Unit. Provide Mechanical Engineer to assist with projects completions.
2005:
Design and drafting of vessel modifications, foundation designs and the 400 Unit TAR. Detailed design of increase in Furnace stack height. Design internal stack trolley. Foundations design. Vessels nozzle additions for the Hydro-craker TAR.
Year: 2003 - 2005
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
2003, 2005 Turnarounds Projects.
2003:
Design and drafting of Lube Oil and Seal Oil skids and tanks, piping stress analysis and support design for FCCU compressor turbine steam piping, FEA analysis and design of FCCU bypass ductwork expansion elbows.
Pipe Stress Analysis and API 610 pump compliance calculations for new pumps in the Alkylation Unit. Provide Mechanical Engineer to assist with projects completions.
2005:
Design and drafting of vessel modifications, foundation designs and the 400 Unit TAR. Detailed design of increase in Furnace stack height. Design internal stack trolley. Foundations design. Vessels nozzle additions for the Hydro-craker TAR.
Year: 2000
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
Clean Fuels Project, 2000.
$5.0m Sulphur Prilling Project
$0.85m No.4 Steam Boiler Auto-start Project
$0.7m 101B Steam Generator Project
$0.45m BP to Shell J.V. LPG Pipeline
$0.25m Diesel Lubricity Project
$0.32m LRP Project
Mr G Bartley was appointed Project Manager and GWB Engineering performed all design, drafting and site supervision. The work involved Capital cost estimates, Set-up and maintain Schedules, Engineering and Drafting of plant layouts, piping (layouts plus isometrics), Pipe Stress Analysis, Procurement, Vendor data control, expediting delivery of all equipment.
Year: 1998 - 1999
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
$3.8m Jet Merox Project
Project Management, Engineering and Drafting of plant layouts, piping (layouts plus isometrics), pipe stressing, drafting instrument/electrical. Vendor data control, expediting delivery of all equipment. As-built in PDS - 3D Drafting Software.
$6.0m De-Isobutaniser Project
Engineering and Drafting of plant layouts, piping (layouts plus isometrics), pipe stressing, drafting instrument/electrical. Vendor data control, expediting delivery of all equipment.
$4.5m Alkylation KOH Neutralisation Project
Design and drafting of piping (including isometrics), pipe stressing. Provide a Procurement Officer to assist the BP Engineer. Review of all Pressure Vessel vendor drawings.
Year: 1997 - 1998
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
$5.2m North Vapour Recovery Project
Engineering and Drafting of plant layouts, piping (layouts plus isometrics), pipe stressing, foundations, pipe-rack, platforms, instrument/electrical. Project Management services include reporting, preparation of tender documents for all vessels (2 columns, 2 drums, 13 heat-exchangers), civil works, piping.
G.W.B.Engineering has performed vendor data control, expediting delivery of all equipment (including 6 pumps), answering of all technical questions, assisting with material purchases and site supervision.
$2.5m Jet Treating Stage 1 Project
Design and drafting of piping (including isometrics), pipe stressing, equipment foundations, pipe-racks.
Year: 1995
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
$2.1m 1000t Butane Sphere Project
Project Management, Design and Drafting of piping (including isometrics), foundations, paving, drainage. Review of Pressure Vessel vendor drawings. Supervision of Sphere construction and other Contractors.
Year: 1993
Client: BP Refinery, Bulwer Island, Brisbane
Industry: Crude Oil Refinery
Job Description:
$1.2m Diesel Blending Poject
Project Management, Design and Drafting of Process Area and Product Terminal piping (including isometrics), foundations. Supervise Contractors.
Back to Top
Shell
Year: 1993 - 2005
Client: Shell Australia
Industry: Petroleum Fuels, Lubricants and Bitumen
Job Description:
2005:
Townsville Bitumen Plant - Design of replacement pressure vessel.
2004:
Miscellaneous projects at Brisbane Bitumen Plant.
1999-2003:
Provide Engineering and Drafting services for numerous Projects at the Eagle Farm Bitumen Plant.
1994 - 1998:
Design and drafting of Piping modifications.
1996:
Piping stress analysis and drafting in the Bitumen Plant.
1996:
Field check, draft CAD P&I.D.'s for the Bitumen Plants at Brisbane and Townsville.
1995, 1996:
Pressure vessel modifications - design and drafting.
1995:
Piping design and detailing at the Shell Terminal Fire-water tank.
1993:
Perform detailed structural calculations of the Shell Grease Plant kettle's mixers; Fatigue assessment and specialist pressure vessel calculations of Grease Kettles/Autoclaves for the new Grease Plant.
Back to Top
BP Bitumen
Year: 1996 - 2001
Client: BP Bitumen, Bulwer Island, Brisbane
Industry: Bitumen Production
Job Description:
2001
Drafting of P&ID's
1996 - 1999
Design and Drafting of miscellaneous piping projects.
1997 Access-ways safety audit
Detailed design and drafting of platform and ladder modifications.
Back to Top
BP Australia
Year: 1996 - 2005
Client: BP Australia, Whinstanes, Brisbane
Industry: Distribution of Petroleum Products
Job Description:
2005: Design and drafting for Gladstone Terminal Fire-fighting upgrade Project.
2004: Design and drafting piping for Whiinstanes Terminal Dewatering Project.
2003: Design and drafting of tanks dewatering piping for Whinstanes and Gladstone sites.
1998 - 2003: Design and drafting of Queensland Rail Fuel Storage Facilities. Numerous sites throughout the state are being replaced with new facilities and involves the design and drafting of bunded above ground Diesel Storage tanks and associated piping in accordance with AS1940-1993 'The storage and handling of flammable and combustible liquids'.
1997: Design and drafting of BHP Cannington's Mine Fuel Storage Depots.
1997: Design and drafting of Tanami Mine various Fuel Storage Facilities.
1996 - 1999: Design and drafting of numerous BP Depots through-out Queensland.
Back to Top
BCC
Year: 2002 - 2004
Client: Brisbane City Council
Industry: Asphalt Plant
Job Description:
2004
Design and drafting of piping.
2003
Design of bitumen tank foundations and bund, drafting piping modifications.
2002
Design and drafting of a 6.5m conical bottom Bitumen Storage Tank.